Work Experience
The company has excellent experience in the construction of building, road, bridges, irrigation and electric projects. Besides this the company has sound experience in providing technical management support for various engineering construction projects to our clients specially local, national and international contractor by providing and supplying technical man powers, support staffs and experienced gangs of worker and other technical support.
The clients include most of GON ministries, departments, and authorities, private institutions, international agencies KfW, SDC and international contractors. The major projects that have been successfully completed by the company are as listed below;
SN |
Project Name and Country |
Client |
Type of Work Performed |
Status/ Date of Completion |
01 |
Construction of Employer/Engineer’s Permanent Camp Construction |
Upper Trishuli 3A Hydro-Electric Project |
Construction of Employer/Engineer’s Permanent Camp Construction. |
Ongoing |
02 |
Construction of Command Area Protection Works |
Department of Irrigation, Nepal |
Construction of Gabion & RCC Structure including earthworks for River Training Works. |
Ongoing |
03 |
Construction of Rodi Khola RCC Bridge at Marki Chowk, Abu Khaireni in Prithivi Highway. |
Department of Roads, Western Regional Road Directorate, Division Road Office, Damauli, Tanahun. |
Construction of RCC Rodi Khola Bridge including river training works and pavement works. |
Ongoing |
04 |
Construction of City View Apartments at Sanepa, Lalitpur |
Cityscape Developers (P) Ltd. , Jawalakhel, Laitpur |
Construction of Apartments of 12 Stories Building including basement and ground floor, Sanepa , Laliltpur, Nepal. Main features ; 38 exclusive apartments (including 2 nos. duplex pent houses) |
Ongoing |
05 |
Construction of DownTown Apartments at Dhapakhel, Lalitpur |
Down Town Housing Pvt. Ltd. , Jawalakhel, Laitpur |
Construction of Apartments of Sixteen Stories Building including basement and ground floor for parking at Dhapahakhel, Laliltpur, Nepal. Main features ; 207 exclusive apartments (including 4 nos. duplex pent houses) |
81% Completed |
06 |
Construction and Upgrading of Hilepani-Diktel Road Project |
Main Contractor: M/s Telecommunication Consultants India Limited in JV with Santoshi, Swachchhanda |
Upgrading of Earthen Rural Road to Bituminous Sealed Feeder road and works comprised of Subbase , base and otta seal surfacing works. |
20 June 2012 |
07 |
Construction and Upgrading of Hilepani-Diktel Road Project |
Main Contractor: M/s Telecommunication Consultants India Limited in JV with Santoshi, Swachchhanda |
Upgrading of Earthen Rural Road to Bituminous Sealed Feeder road and works comprised of Earthworks, Gabion Works, Masonry Works, RCC works, Hupe pipe Laying works, Subbase , base and otta seal surfacing works. |
26 July 2011 |
08 |
Reconstruction and Rehabilitation of Flood Damages along the Strategic Road Network in Arniko Highway Contract no. RRFD/AH/01 (Km. 38+200 to 47+000 |
Swiss Agency for Development and Cooperation |
Masonry and Gabion off road structure, Masonry Side Drain, Earth Work, Sub-base work, base course work, surface dressing and re-sealing work including slope stabilization by bio-engineering. |
20 October 2005 |
09 |
Sirshe Irrigation Project |
Department of Irrigation |
5.00 km Masonry canal and 200 m concrete barrel construction with excavation of 200 m length and average 15m open box cutting |
2058 |
10 |
Bagmati River Training Works |
Department of Irrigation |
198m length earthen embankment guide bund and 278m of spur works. |
2057 |
11 |
Tribhuwan Highway Rehabilation Project |
Department of Roads |
Rehabilitation of Sopyang bridge and river training and slope stabilization works including construction anchor walls in Bhainse – Hetauda Section. |
June 1994 |
12 |
Doti Road Project Contract No. 4 |
Department of Roads |
Masonry and Gabion off road structure, Masonry Side Drain, Earth Work, Cross Drainage Structure such as pipe culverts, slab culvert and minor bridge etc. for Bandugrsain-Dipyal Section(25km) |
February 1994 |
13 |
Maleku – Mungling Road Rehabilitation Project of Prithivi Highway |
Crown Agent Kier Joint Venture UK |
Chainage 79+226 to 80+419, 72+675 to 73+180 of masonry wall, gabion wall, drainage, backfilling and earth works |
August 1991 |
14 |
Hetauda Cement Factory Construction Project |
Hetauda Cement Factory |
Construction of Staff QuarterBuilding, boundary wall works |
August 1988 |